
It is a vital milestone for the Hinkley Level C building in Somerset. Already 8,000 persons are running on the building web site.
The reactor has been made via Framatome in France and springs from the similar manufacturing unit that made the final nuclear reactor for a British energy station in 1995. This used to be for Sizewell B, in Suffolk.
Video presentations the Hinkley Level C reactor’s adventure to Somerset (Credit score: Hinkley Level C)
The reactor power vessel weighs 500 tonnes and is 13m lengthy. It is going to create warmth had to make steam for the sector’s greatest generators.
It’s the first of 2 nuclear reactors that will probably be put in at Hinkley. Every reactor will lend a hand supply low-carbon electrical energy for three million properties.

The reactor first arrived at Avonmouth Docks in Bristol and used to be transported via barge to Combwich Wharf at the River Parrett in Somerset.
The general 4 miles of the commute took 5 hours as the large piece of kit used to be carried via a transporter to its everlasting house.

Supply By way of https://constructionmanagement.co.united kingdom/in-pictures-first-hinkley-point-c-reactor-journeys-to-site/